Work Order Material Checks in PAX ERP

Before anyone pulls parts, PAX shows how many of each component the work order needs and how many are on hand. Your team can see which parts are short while planning the job. Saving a draft doesn’t reserve stock. When you issue materials to the job, PAX checks the selected stock again and deducts what you issue.
Can I see what’s short before I create the work order?
Yes. PAX uses the bill of materials and the quantity you plan to build. If each assembly uses two screws, a work order for ten assemblies shows twenty screws needed. You can compare the requirement for the whole batch with the current on-hand quantity before saving the job.
What if two jobs need the same part?
You have 12 connectors on hand and two jobs need 8 each. Every other component is ready. Both drafts can show 12 on hand because neither has reserved any. Your team decides which job gets the parts first.
| What happened | Connectors on hand | Can Job B get all 8? |
|---|---|---|
| Both jobs are saved as drafts | 12 | Yes, if it goes first |
| 8 connectors are issued to Job A | 4 | No, it’s 4 short |
| Receiving posts 4 more connectors | 8 | Yes |
Do incoming parts count toward the job?
An open purchase order tells you what’s expected. It doesn’t add to the on-hand count. In this example, if the supplier sends two of the four connectors, posting that receipt brings the count to six. Job B is still two short. Once receiving posts the other two, there’s enough to issue Job B in full. Use the supplier’s date to plan; use the posted count to decide what you can pull now.
What if stock changes after I check, or I need a specific lot?
PAX checks the selected inventory record or lot when you post the issue. The earlier availability check won’t let you issue eight from a lot that now has only four. If the job calls for a specific lot, check that lot at issue rather than relying on the part’s total. Like any inventory check, it’s only as accurate as what your team has recorded. If parts were taken off the shelf without being issued, the on-screen count can still be high.
If you’re evaluating PAX, bring one part that goes into two of your regular builds. Check both jobs, issue one, and see what the second is short. The BOM-to-finished-goods walkthrough shows the check and issue on a complete work order.