Manufacturing ERP with built-in accounting
If your shop tracks repeat builds in a spreadsheet and keeps the books in QuickBooks, you can move both into PAX. When you issue parts and log time on a work order, PAX posts material, labor and overhead to work in process (WIP). Receiving finished units moves their cost from WIP to finished inventory on the same general ledger.
What posted for one ten-unit work order?
In the PAX demo, work order WO-20260067 used components from stock and 2.50 hours of production time. The shop received all ten units together. See the original work order and finished lot.
| Shop activity | What changed in the books |
|---|---|
| Issue components to the job | PAX debits WIP and credits component inventory as the selected lots leave stock. Those lots put $74.37 of material on this work order. |
| Log 2.50 production hours | PAX debits WIP for $91.50 of labor and $95.00 of overhead. The credits go to the accounts your company uses for applied labor and overhead. The job now holds $260.87 in WIP. |
| Receive ten finished units | PAX debits finished goods and credits WIP for $260.87. The lot stores $26.08652 per unit, or about $26.09. This work order has $0 left in WIP. |
Open the full-size cost summaryWhat if only four units are ready at month-end?
Suppose the same job has its first receipt after all 2.50 hours have been logged, with no scrap or outside services. Four units are ready for stock and six still need work. Save Partial receives the four and keeps the order open.
The four units take four tenths of the issued material, or $29.75. Labor and overhead transfer at the amounts posted since the last completion. For this first receipt, that includes the full $91.50 of labor and $95.00 of overhead.
- Transferred to finished goods for four units
- $216.25
- Material still in WIP for the remaining six
- $44.62
A user with cost access can compare Total in WIP with Transferring before posting the receipt. Any labor and overhead recorded afterward add to the open job. When the last six units are ready, Complete WO transfers the remaining WIP into finished goods. Review partial and final completions.
Can your bookkeeper run the rest of the books here?
PAX has its own general ledger, payables and receivables. Your bookkeeper can enter vendor bills, apply customer payments, reconcile bank and credit card statements, and produce a trial balance, balance sheet and income statement. Explore PAX Finance.
At close, finance can check posting dates, journal references, debits, credits and running balances by account. If inventory and the ledger disagree, you can trace the difference back to receipts, issues, completions and adjustments. See how to investigate an inventory-to-ledger difference.
Bring a job that crossed month-end
Bring its material issues, labor hours and receipt quantities. We’ll walk through them with your production lead and bookkeeper so you can check the finished lot, the open WIP and the ledger together.